Quad-axle hauling
Purpose-built capacity for demanding payloads, planned around the work and the route.
Responsive hauling, quad-axle capacity, and a team that keeps every mile accountable.
Purpose-built capacity for demanding payloads, planned around the work and the route.
Reliable movement of construction materials with clear communication from dispatch to delivery.
Scheduled and on-demand coordination that keeps crews aligned and projects moving.
What we haul
If it comes off a site or has to get to one, we move it — for general contractors, paving crews, excavators, and other carriers who need overflow trucks.
01
Site spoil out, structural fill in, staged to keep the excavator working.
02
Base stone, crusher run and rock delivered by the load or by the day.
03
Plant-to-site cycles timed to the paving window so the crew keeps laying.
04
Millings hauled off the mill or delivered for base and driveway work.
05
Broken concrete and rubble removed and taken to an approved disposal site.
06
Demolition and cleanup loads off the jobsite, with disposal coordinated.
The fleet
More axles mean more legal weight per trip. Fewer trips mean lower cost per ton and less traffic through your gate. We spec our trucks for the loads Memphis contractors actually move.
Every truck is inspected, maintained on a preventive schedule, and driven by a licensed, qualified driver.
Check availabilityFleet size
Confirm before publishing.
Configuration
Matched to the haul and the site.
Service radius
From Memphis, both sides of the line.
Typical response
Quotes answered the day you ask.
Before you hire us
Any hauler worth putting on your schedule will hand over their DOT number, their certificate of insurance, and their inspection record without being chased for it. Here's ours, up front.
Get the compliance packetB&M Trucking 2 LLC is a Memphis-based Tennessee company. We are not affiliated with B & M Trucking LLC of Broomfield, Colorado. Match our USDOT number above to be sure you're looking at the right carrier.
How it works
Step 01
Material, quantity, pickup, drop, and the day you need it. Thirty seconds on the phone is usually enough.
Step 02
We quote from actual availability, not a maybe. If we can't cover it, we say so the same day so you can call someone else.
Step 03
Driver assigned, ETA sent, load ticketed the same day, invoice behind it. Nothing to chase.
Coverage
We run the Memphis metro daily and cross into North Mississippi regularly. If your site is outside this list, call anyway — we'll tell you straight whether we can cover it.
Common questions
Often the same day, depending on what's already committed. Call and we'll tell you what's actually free rather than guessing.
Both. Short hauls usually price better hourly; longer hauls usually price better per ton. Tell us the job and we'll quote it the way that costs you less.
Yes. Certificate of insurance and W-9 go out the same day you ask — see the compliance details above.
Regularly. If you're a dispatcher short on trucks, call us for overflow. Quick yes or no, clean paperwork.
No. We haul construction materials and debris: dirt, gravel, asphalt, millings, concrete, and demolition loads.
Request a quote
Every request gets an answer the same business day. If you're on a jobsite, calling is faster.